{"id":146,"date":"2020-04-03T09:11:11","date_gmt":"2020-04-03T09:11:11","guid":{"rendered":"https:\/\/temp.ashkerala.com\/?p=146"},"modified":"2020-04-03T09:11:11","modified_gmt":"2020-04-03T09:11:11","slug":"software-engineering-multiple-choice-4","status":"publish","type":"post","link":"https:\/\/temp.ashkerala.com\/?p=146","title":{"rendered":"Software Engineering Multiple Choice-4"},"content":{"rendered":"<p><strong>1) From the following, which software has been characterized by \u0393\u00c7\u00ffNumber Crunching\u0393\u00c7\u00d6 Algorithms?<\/strong><\/p>\n<p>a. System software<br \/> b. Artificial intelligence software<br \/> c. Embedded software<br \/> d. Engineering and scientific software<\/p>\n<p>ANSWER: Engineering and scientific software<\/p>\n<p><strong>2) IEEE provides a standard as IEEE 830-1993. For which activity this standard is recommended standard?<\/strong><\/p>\n<p>a. Software requirement specification.<br \/> b. Software design.<br \/> c. Testing.<br \/> d. Both a and b<\/p>\n<p>ANSWER: Software requirement specification.<\/p>\n<p><strong>3) A generic process framework for software engineering encompasses five activities. What are those activities?<\/strong><\/p>\n<p>a. Communication, risk management, measurement, production, deployment.<br \/> b. Communication, Planning, Modeling, construction, deployment.<br \/> c. Analysis, designing, programming, debugging, maintenance<br \/> d. None of the above.<\/p>\n<p>ANSWER: Communication, Planning, Modeling, construction, deployment.<\/p>\n<p><strong>4) Who deliver the technical skills that are necessary to engineer for a product or an application?<\/strong><\/p>\n<p>a. Project managers<br \/> b. Practitioners<br \/> c. Customers<br \/> d. End users<\/p>\n<p>ANSWER: Practitioners<\/p>\n<p><strong>5) Project risk factor is considered in which model?<\/strong><\/p>\n<p>a. Spiral model.<br \/> b. Waterfall model.<br \/> c. Prototyping model<br \/> d. None of the above.<\/p>\n<p>ANSWER: Spiral model.<\/p>\n<p><strong>6) What is a child window that contains message for the user and request for some action to be taken?<\/strong><\/p>\n<p>a. Dialogue box<br \/> b. Text-Box<br \/> c. Check-Box<br \/> d. Radio Button<\/p>\n<p>ANSWER: Dialogue box<\/p>\n<p><strong>7) A Project can be characterized as _____ .<\/strong><\/p>\n<p>a. Every project may not have a unique and distinct goal.<br \/> b. Project is routine activity or day-to-day operations.<br \/> c. Project does not comes with a start time and end time.<br \/> d. All mentioned above.<br \/> e. None of the above.<br \/> ANSWER: None of the above.<\/p>\n<p><strong>8) Which model is not suitable for large software projects but good one for learning and experimenting?<\/strong><\/p>\n<p>a. Big Bang model<br \/> b. Spiral model<br \/> c. Iterative model<br \/> d. Waterfall model<\/p>\n<p>ANSWER: Big Bang model<\/p>\n<p><strong>9) Which includes modifications and updations done in order to correct or fix the problems, that are either discovered by user or concluded by user error reports?<\/strong><\/p>\n<p>a. Perfective maintenance<br \/> b. Adaptive maintenance<br \/> c. Corrective maintenance<br \/> d. Preventive maintenance<\/p>\n<p>ANSWER: Corrective maintenance<\/p>\n<p><strong>10) Boehm suggests an approach that addresses project objectives, milestones and schedules, responsibilities, management and technical approaches and required resources, This principle is called as ______ .<\/strong><\/p>\n<p>a. W3HH principle<br \/> b. WHO principle<br \/> c. W5HH principle<br \/> d. None of the above.<\/p>\n<p>ANSWER: W5HH principle<\/p>\n<p><strong>11) The objective for formal technical review is to core errors in software work products.<\/strong><\/p>\n<p>a. True<br \/> b. False<\/p>\n<p>ANSWER: False<\/p>\n<p><strong>12) CASE tools are set of automated software application programs, that are not used to support, accelerate and smoothen the SDLC activities.<\/strong><\/p>\n<p>a. Yes<br \/> b. No<\/p>\n<p>ANSWER: No<\/p>\n<p><strong>13) From the following give three major categories of risk,<\/strong><br \/> <strong>1) Schedule risk<\/strong><br \/> <strong>2) Project risk<\/strong><br \/> <strong>3) Technical risk<\/strong><br \/> <strong>4) Business risk<\/strong><\/p>\n<p>a. 1,2 and 3<br \/> b. 2,3 and 4<br \/> c. 1,2 and 4<br \/> d. 1,3 and 4<\/p>\n<p>ANSWER: 2,3 and 4<\/p>\n<p><strong>14) Activities and action taken on the data are represented by circle or round-edged rectangles is called _____ .<\/strong><\/p>\n<p>a. Entities<br \/> b. Process<br \/> c. Data storage<br \/> d. Data flow<\/p>\n<p>ANSWER: Process<\/p>\n<p><strong>15) The six sigma for software engineering what gives the existing process and its output to determine the current quality performance?<\/strong><\/p>\n<p>a. Define<br \/> b. Analyze<br \/> c. Measure<br \/> d. None of the above<\/p>\n<p>ANSWER: Measure<\/p>\n<p><strong>16) Which tools are helpful in all the stages of SDLC, for requirement gathering to testing and documentation?<\/strong><\/p>\n<p>a. Upper case tools<br \/> b. Lower case tools<br \/> c. Integrated case tools<br \/> d. None of the above<\/p>\n<p>ANSWER: Integrated case tools<\/p>\n<p><strong>17) OOD languages provide a mechanism where methods performing similar tasks but vary in arguments, and that can be assigned to the same name is called _____ .<\/strong><\/p>\n<p>a. Classes<br \/> b. Object<br \/> c. Polymorphism<br \/> d. Encapsulation<\/p>\n<p>ANSWER: Polymorphism<\/p>\n<p><strong>18) Abbreviate the term SMI.<\/strong><\/p>\n<p>a. Software Maturity Index<br \/> b. Software Model Instruction<br \/> c. Software Maturity Instruction<br \/> d. Software Model Index<\/p>\n<p>ANSWER: Software Maturity Index<\/p>\n<p><strong>19) What computer-based system can have a profound effect on the design that is chosen and also the implementation approach will be applied?<\/strong><\/p>\n<p>a. Scenario-based elements<br \/> b. Class-based elements<br \/> c. Behavioural elements<br \/> d. Flow-oriented elements<\/p>\n<p>ANSWER: Behavioural elements<\/p>\n<p><strong>20) SRS is a document created by system analyst after the requirements are collected from various stakeholders.<\/strong><\/p>\n<p>a. Yes<br \/> b. No<\/p>\n<p>ANSWER: Yes<\/p>\n<p><strong>21) Which structures in Organizational Paradigms on a team loosely and depends on individual initiative of the team members?<\/strong><\/p>\n<p>a. Closed paradigm<br \/> b. Open paradigm<br \/> c. Random paradigm<br \/> d. Synchronous paradigm<\/p>\n<p>ANSWER: Random paradigm<\/p>\n<p><strong>22) Give the name to diagram that represents the flow of activities described by the use cases and at the same time the captors are involved in UML .<\/strong><\/p>\n<p>a. State diagram<br \/> b. Swim lane diagram<br \/> c. Activity diagram<br \/> d. Component diagram<\/p>\n<p>ANSWER: Swim lane diagram<\/p>\n<p><strong>23) Which phase is refers to the support phase of software development?<\/strong><\/p>\n<p>a. Acceptance Phase.<br \/> b. Testing.<br \/> c. Maintenance.<br \/> d. None of the above.<\/p>\n<p>ANSWER: Maintenance.<\/p>\n<p><strong>24) Which model is also called as the classic life cycle or the Waterfall model?<\/strong><\/p>\n<p>a. Iterative Development<br \/> b. Linear Sequential Development<br \/> c. RAD Model.<br \/> d. Incremental Development<\/p>\n<p>ANSWER: Linear Sequential Development<\/p>\n<p><strong>25) What is the average effective global activity rate in an evolving E-type system is invariant over the lifetime of the product?<\/strong><\/p>\n<p>a. Self-regulation<br \/> b. Reducing quality<br \/> c. Feedback systems<br \/> d. Organizational stability<\/p>\n<p>ANSWER: Organizational stability<\/p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>1) From the following, which software has been characterized by \u0393\u00c7\u00ffNumber Crunching\u0393\u00c7\u00d6 Algorithms? a. System software b. Artificial intelligence software c. Embedded software d. Engineering and scientific software ANSWER: Engineering and scientific software 2) IEEE provides a standard as IEEE 830-1993. For which activity this standard is recommended standard? a. Software requirement specification. b. Software&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_kad_post_transparent":"","_kad_post_title":"","_kad_post_layout":"","_kad_post_sidebar_id":"","_kad_post_content_style":"","_kad_post_vertical_padding":"","_kad_post_feature":"","_kad_post_feature_position":"","_kad_post_header":false,"_kad_post_footer":false,"footnotes":""},"categories":[13],"tags":[],"class_list":["post-146","post","type-post","status-publish","format-standard","hentry","category-software-engineering"],"_links":{"self":[{"href":"https:\/\/temp.ashkerala.com\/index.php?rest_route=\/wp\/v2\/posts\/146","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/temp.ashkerala.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/temp.ashkerala.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/temp.ashkerala.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/temp.ashkerala.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=146"}],"version-history":[{"count":0,"href":"https:\/\/temp.ashkerala.com\/index.php?rest_route=\/wp\/v2\/posts\/146\/revisions"}],"wp:attachment":[{"href":"https:\/\/temp.ashkerala.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=146"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/temp.ashkerala.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=146"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/temp.ashkerala.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=146"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}