{"id":147,"date":"2020-04-03T09:11:52","date_gmt":"2020-04-03T09:11:52","guid":{"rendered":"https:\/\/temp.ashkerala.com\/?p=147"},"modified":"2020-04-03T09:11:52","modified_gmt":"2020-04-03T09:11:52","slug":"software-engineering-multiple-choice-5","status":"publish","type":"post","link":"https:\/\/temp.ashkerala.com\/?p=147","title":{"rendered":"Software Engineering Multiple Choice-5"},"content":{"rendered":"<p><strong>1) Which document is created by system analyst after the requirements are collected from Various stakeholders?<\/strong><\/p>\n<p>a. Software requirement specification<br \/> b. Software requirement validation<br \/> c. Feasibility study<br \/> d. Requirement Gathering<\/p>\n<p>ANSWER: Software requirement specification<\/p>\n<p><strong>2) Which is focused towards the goal of the organization?<\/strong><\/p>\n<p>a. Feasibility study<br \/> b. Requirement gathering<br \/> c. Software requirement specification<br \/> d. Software requirement validation<\/p>\n<p>ANSWER: Feasibility study<\/p>\n<p><strong>3) The architectural model is derived from which of these sources?<\/strong><\/p>\n<p>A) Information about the application domain for the software to be built;<br \/> B) Specific requirements model elements such as data flow diagrams or analysis classes, their relationships and collaborations for the problem at hand;<br \/> C) The availability of architectural styles and patterns.<\/p>\n<p>a. Both A &amp; B<br \/> b. Both B &amp; C<br \/> c. Both A &amp; C<br \/> d. All mentioned above<\/p>\n<p>ANSWER: All mentioned above<\/p>\n<p><strong>4) What is the correctness, completeness, and consistency of the requirements model will have a strong influence on the quality of all work products that follow?<\/strong><\/p>\n<p>a. Requirement quality<br \/> b. Design quality<br \/> c. Code quality<br \/> d. Quality control effectiveness<\/p>\n<p>ANSWER: Requirement quality<\/p>\n<p><strong>5) An entity in ER Model is a real world being, which has some properties called_____ .<\/strong><\/p>\n<p>a. Attributes<br \/> b. Relationship<br \/> c. Domain<br \/> d. None of the above<\/p>\n<p>ANSWER: Attributes<\/p>\n<p><strong>6) Waht is the most common measure for correctness?<\/strong><\/p>\n<p>a. Defects per KLOC<br \/> b. Errors per KLOC<br \/> c. $ per KLOC<br \/> d. Pages of documentation per KLOC<\/p>\n<p>ANSWER: Defects per KLOC<\/p>\n<p><strong>7) Which documentation works as a key tool for software designer, developer and their test team is to carry out their respective tasks?<\/strong><\/p>\n<p>a. Requirement documentation<br \/> b. User documentation<br \/> c. Software design documentation<br \/> d. Technical documentation<\/p>\n<p>ANSWER: Requirement documentation<\/p>\n<p><strong>8) Which tools are used in implementation,testing and maintenance?<\/strong><\/p>\n<p>a. Upper case tools<br \/> b. Integrated case tools<br \/> c. Lower case tools<br \/> d. None of the above<\/p>\n<p>ANSWER: Lower case tools<\/p>\n<p><strong>9) Which risk gives the degree of uncertainty and the project schedule will be maintained so that the product will be delivered in time?<\/strong><\/p>\n<p>a. Business risk<br \/> b. Technical risk<br \/> c. Schedule risk<br \/> d. Project risk<\/p>\n<p>ANSWER: Schedule risk<\/p>\n<p><strong>10) You are working in CareerRide as a project manager. Company wants to develop a project. You are also involved in planning team. What will be your first step in project planning?<\/strong><\/p>\n<p>a. Establish the objectives and scope of the product.<br \/> b. Determine the project constraints.<br \/> c. Select the team.<br \/> d. None of the above.<\/p>\n<p>ANSWER: Establish the objectives and scope of the product.<\/p>\n<p><strong>11) Configuration management is an essential part of the system maintenance. It is aided with version control tools to control versions, semi-version or patch management.<\/strong><\/p>\n<p>a. True<br \/> b. False<\/p>\n<p>ANSWER: True<\/p>\n<p><strong>12) Which model is also known as Verification and validation model?<\/strong><\/p>\n<p>a. Waterfall model<br \/> b. Big Bang model<br \/> c. V-model<br \/> d. Spiral model<\/p>\n<p>ANSWER: V-model<\/p>\n<p><strong>13) Software project management is the process of managing all activities that are involved in software development, they are _____ .<\/strong><\/p>\n<p>a. Time<br \/> b. Cost<br \/> c. Quality management<br \/> d. All mentioned above<\/p>\n<p>ANSWER: All mentioned above<\/p>\n<p><strong>14) A small picture representing an associated application, what does it mean?<\/strong><\/p>\n<p>a. Icon<br \/> b. Window<br \/> c. Menu<br \/> d. Cursor<\/p>\n<p>ANSWER: Icon<\/p>\n<p><strong>15) What is the meaning of requirement elicitation in software engineering?<\/strong><\/p>\n<p>a. Gathering of requirement.<br \/> b. Understanding of requirement.<br \/> c. Getting the requirements from client.<br \/> d. All of the above.<\/p>\n<p>ANSWER: All of the above.<\/p>\n<p><strong>16) Which of the following is\/are Project Estimation Technique?<\/strong><\/p>\n<p>a. Empirical Estimation Technique.<br \/> b. Heuristic Estimation Technique.<br \/> c. Analytical Estimation Technique.<br \/> d. All of the above.<\/p>\n<p>ANSWER: All of the above.<\/p>\n<p><strong>17) The maximum number of objects that can participate in a relationship is called________ .<\/strong><\/p>\n<p>a. Cardinality<br \/> b. Attributes<br \/> c. Operations<br \/> d. Transformers<\/p>\n<p>ANSWER: Cardinality<\/p>\n<p><strong>18) What is legacy system?<\/strong><\/p>\n<p>a. A legacy system refers to newer version of software.<br \/> b. A legacy system refers to outdated application software that is used instead of available upgraded versions.<br \/> c. A legacy system always devolved by advance technology.<br \/> d. None of the above.<\/p>\n<p>ANSWER: A legacy system refers to outdated application software that is used instead of available upgraded versions.<\/p>\n<p><strong>19) Which of the following cannot be applied with the software according to Software Engineering Layers?<\/strong><\/p>\n<p>a. Process<br \/> b. Methods<br \/> c. Manufacturing<br \/> d. None of the above.<\/p>\n<p>ANSWER: Manufacturing<\/p>\n<p><strong>20) Which software is used to control products and systems for the consumer and industrial markets?<\/strong><\/p>\n<p>a. System software<br \/> b. Artificial intelligence software<br \/> c. Embedded software<br \/> d. Engineering and scientific software<\/p>\n<p>ANSWER: Embedded software<\/p>\n<p><strong>21) Which software enables the program to adequately manipulate information?<\/strong><\/p>\n<p>a. Instructions<br \/> b. Data Structures<br \/> c. Documents<br \/> d. All of the above<\/p>\n<p>ANSWER: Data Structures<\/p>\n<p><strong>22) Which coding element is generally omitted at the end of line?<\/strong><\/p>\n<p>a. Naming conventions<br \/> b. Identifying<br \/> c. Whitespace<br \/> d. Operators<\/p>\n<p>ANSWER: Whitespace<\/p>\n<p><strong>23) The rules of writing \u0393\u00c7\u00ffif-then-else\u0393\u00c7\u00d6, \u0393\u00c7\u00ffcase-switch\u0393\u00c7\u00d6, \u0393\u00c7\u00ffwhile-until\u0393\u00c7\u00d6 and \u0393\u00c7\u00fffor\u0393\u00c7\u00d6 control flow statements are called _____ .<\/strong><\/p>\n<p>a. Comments<br \/> b. Functions<br \/> c. Line length and wrapping<br \/> d. Control Structure<\/p>\n<p>ANSWER: Control Structure<\/p>\n<p><strong>24) If an application allows executing multiple instances of itself, they appear on the screen as separate windows are called ______ .<\/strong><\/p>\n<p>a. Window<br \/> b. Tabs<br \/> c. Menu<br \/> d. Cursor<\/p>\n<p>ANSWER: Tabs<\/p>\n<p><strong>25) Match the List 1 to List 2 and choose the correct option.<\/strong><\/p>\n<p>1. Requirement Elicitation \u0393\u00c7\u00f6\u0393\u00c7\u00f6- a. Module Development and integration.<br \/> 2. Design\u0393\u00c7\u00f6\u0393\u00c7\u00f6\u0393\u00c7\u00f6\u0393\u00c7\u00f6\u0393\u00c7\u00f6\u0393\u00c7\u00f6\u0393\u00c7\u00f6\u0393\u00c7\u00f6\u0393\u00c7\u00f6\u0393\u00c7\u00f6b. Analysis<br \/> 3. Implementation\u0393\u00c7\u00f6\u0393\u00c7\u00f6\u0393\u00c7\u00f6\u0393\u00c7\u00f6\u0393\u00c7\u00f6\u0393\u00c7\u00f6c. Structure and behavioral<br \/> 4. Maintenance \u0393\u00c7\u00f6\u0393\u00c7\u00f6\u0393\u00c7\u00f6\u0393\u00c7\u00f6\u0393\u00c7\u00f6\u0393\u00c7\u00f6\u0393\u00c7\u00f6 d. Performance tuning.<\/p>\n<p>a. 1-c , 2-a , 3-d , 4-b<br \/> b. 1-c , 2-a , 3-b , 4-d<br \/> c. 1-a , 2-c , 3-d , 4-b<br \/> d. 1-b , 2-c , 3-a , 4-d<\/p>\n<p>ANSWER: 1-b , 2-c , 3-a , 4-d<\/p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>1) Which document is created by system analyst after the requirements are collected from Various stakeholders? a. Software requirement specification b. Software requirement validation c. Feasibility study d. Requirement Gathering ANSWER: Software requirement specification 2) Which is focused towards the goal of the organization? a. Feasibility study b. Requirement gathering c. Software requirement specification d&#8230;.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_kad_post_transparent":"","_kad_post_title":"","_kad_post_layout":"","_kad_post_sidebar_id":"","_kad_post_content_style":"","_kad_post_vertical_padding":"","_kad_post_feature":"","_kad_post_feature_position":"","_kad_post_header":false,"_kad_post_footer":false,"footnotes":""},"categories":[13],"tags":[],"class_list":["post-147","post","type-post","status-publish","format-standard","hentry","category-software-engineering"],"_links":{"self":[{"href":"https:\/\/temp.ashkerala.com\/index.php?rest_route=\/wp\/v2\/posts\/147","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/temp.ashkerala.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/temp.ashkerala.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/temp.ashkerala.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/temp.ashkerala.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=147"}],"version-history":[{"count":0,"href":"https:\/\/temp.ashkerala.com\/index.php?rest_route=\/wp\/v2\/posts\/147\/revisions"}],"wp:attachment":[{"href":"https:\/\/temp.ashkerala.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=147"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/temp.ashkerala.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=147"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/temp.ashkerala.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=147"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}