{"id":216,"date":"2020-04-05T08:05:57","date_gmt":"2020-04-05T08:05:57","guid":{"rendered":"https:\/\/temp.ashkerala.com\/?p=216"},"modified":"2020-04-05T08:05:57","modified_gmt":"2020-04-05T08:05:57","slug":"information-system-analysis-and-design-mcq-5","status":"publish","type":"post","link":"https:\/\/temp.ashkerala.com\/?p=216","title":{"rendered":"Information System Analysis and Design MCQ-5"},"content":{"rendered":"<p>31 A \u0393\u00c7\u00aa\u0393\u00c7\u00aa\u0393\u00c7\u00aa\u0393\u00c7\u00aa\u0393\u00c7\u00aa\u0393\u00c7\u00aa system in no more than idea. <br \/>A) Conceptual <br \/>B) Logical <br \/>C) Physical <br \/>D) None<\/p>\n<p>32 Design Phase consists of \u0393\u00c7\u00aa\u0393\u00c7\u00aa\u0393\u00c7\u00aa\u0393\u00c7\u00aa\u0393\u00c7\u00aa\u0393\u00c7\u00aa\u0393\u00c7\u00aa\u0393\u00c7\u00aa. <br \/>1. Identity the functions to be performed <br \/>2. Design the input\/output and file design <br \/>3. Defining basic parameters for system design <br \/>A) 1 &amp; 2 <br \/>B) 2 &amp; 3 <br \/>C) 1 &amp; 3 <br \/>D) 1, 2 &amp; 3<\/p>\n<p>33 A context diagram <br \/>A) Describes the context of a system <br \/>B) is a DFD which gives an overview of the system <br \/>C) is a detailed description of a system <br \/>D) is not used in drawing a detailed DFD<\/p>\n<p>34 HIPO stand for <br \/>A) Hierarchy input process output <br \/>B) Hierarchy input plus output <br \/>C) Hierarchy plus input process output <br \/>D) Hierarchy input output Process<\/p>\n<p>35 Statement of scope and objectives, opportunities and performance criteria \u0393\u00c7\u00aa\u0393\u00c7\u00aa\u0393\u00c7\u00aa\u0393\u00c7\u00aa. <br \/>A) Problem definition <br \/>B) System analysis <br \/>C) System Design <br \/>D) Documentation<\/p>\n<p>36 Information can be categorized into \u0393\u00c7\u00aa\u0393\u00c7\u00aa\u0393\u00c7\u00aa\u0393\u00c7\u00aa\u0393\u00c7\u00aa. <br \/>1. Environmental information <br \/>2. Competitive information <br \/>3. Government information <br \/>4. Internal information <br \/>A) 1, 2 &amp; 3 <br \/>B) 1, 2 &amp; 4 <br \/>C) 2, 3 &amp; 4 <br \/>D) 1, 3 &amp; 4<\/p>\n<p>37 System Development process is also called as \u0393\u00c7\u00aa\u0393\u00c7\u00aa\u0393\u00c7\u00aa\u0393\u00c7\u00aa\u0393\u00c7\u00aa.. <br \/>A) System Development Life Cycle <br \/>B) System Life Cycle <br \/>C) Both A and B <br \/>D) System Process Cycle<\/p>\n<p>38 The output of problem definition stage is \u0393\u00c7\u00aa\u0393\u00c7\u00aa\u0393\u00c7\u00aa\u0393\u00c7\u00aa\u0393\u00c7\u00aa.. <br \/>A) Master Development Plan <br \/>B) Terms of reference <br \/>C) Feasibility report <br \/>D) Final product<\/p>\n<p>39 Advantages of system flowcharts \u0393\u00c7\u00aa\u0393\u00c7\u00aa\u0393\u00c7\u00aa\u0393\u00c7\u00aa\u0393\u00c7\u00aa\u0393\u00c7\u00aa\u0393\u00c7\u00aa. <br \/>A) Effective communication <br \/>B) Effective analysis <br \/>C) Queasier group or relationships <br \/>D) All A, B, C<\/p>\n<p>40 Based on the identification of objectives, input, output and file content, the vital document is called \u0393\u00c7\u00aa<\/p>\n<p>A) System Definition <br \/>B) System Document <br \/>C) System Requirement Document <br \/>D) System Subject<\/p>\n<p><strong>Answers<\/strong><\/p>\n<p>31. A) Conceptual <br \/>32. D) 1, 2 &amp; 3 <br \/>33. B) is a DFD which &#8230;. of the system <br \/>34. A) Hierarchy input process output <br \/>35. A) Problem definition <br \/>36. B) 1, 2 &amp; 4 <br \/>37. A) System Development Life Cycle <br \/>38. B) Terms of reference <br \/>39. D) All A, B, C <br \/>40. B) System Document<\/p>\n","protected":false},"excerpt":{"rendered":"<p>31 A \u0393\u00c7\u00aa\u0393\u00c7\u00aa\u0393\u00c7\u00aa\u0393\u00c7\u00aa\u0393\u00c7\u00aa\u0393\u00c7\u00aa system in no more than idea. A) Conceptual B) Logical C) Physical D) None 32 Design Phase consists of \u0393\u00c7\u00aa\u0393\u00c7\u00aa\u0393\u00c7\u00aa\u0393\u00c7\u00aa\u0393\u00c7\u00aa\u0393\u00c7\u00aa\u0393\u00c7\u00aa\u0393\u00c7\u00aa. 1. Identity the functions to be performed 2. Design the input\/output and file design 3. Defining basic parameters for system design A) 1 &amp; 2 B) 2 &amp; 3 C) 1 &amp;&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_kad_post_transparent":"","_kad_post_title":"","_kad_post_layout":"","_kad_post_sidebar_id":"","_kad_post_content_style":"","_kad_post_vertical_padding":"","_kad_post_feature":"","_kad_post_feature_position":"","_kad_post_header":false,"_kad_post_footer":false,"footnotes":""},"categories":[20],"tags":[],"class_list":["post-216","post","type-post","status-publish","format-standard","hentry","category-information-system-analysis-and-design"],"_links":{"self":[{"href":"https:\/\/temp.ashkerala.com\/index.php?rest_route=\/wp\/v2\/posts\/216","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/temp.ashkerala.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/temp.ashkerala.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/temp.ashkerala.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/temp.ashkerala.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=216"}],"version-history":[{"count":0,"href":"https:\/\/temp.ashkerala.com\/index.php?rest_route=\/wp\/v2\/posts\/216\/revisions"}],"wp:attachment":[{"href":"https:\/\/temp.ashkerala.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=216"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/temp.ashkerala.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=216"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/temp.ashkerala.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=216"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}